85 m² torch on waterproofing, 72 m² new roofing, structural steel installation, 182 m² floor tiling and extensive home renovations in Fourways Gardens.

The property's existing walls, roofing, ceilings and floor finishes needed to be removed to accommodate a substantial home extension.
The renovation required major structural alterations, including the installation of steel support beams and new brick columns. The existing roof structure also needed assessment to determine which trusses required replacement.
The extension required a new roof structure with effective waterproofing protection.
Without a properly installed waterproofing system, roof surfaces and junctions can become vulnerable to rainwater penetration, potentially damaging ceilings and interior finishes.
The project required 85 m² of torch on bituminous waterproofing, together with a UV resistant protective coating across 72 m².
Removing existing walls and altering the roof created a need for additional structural support.
The extension required multiple structural steel I beams, including a welded corner beam, together with two new brick columns.
These components formed part of the structural design necessary to accommodate the revised building layout and roof construction.
The renovation involved extensive alterations to the property's ceilings, flooring and internal finishes.
New ceiling construction, floor tiling and painting were required to integrate the extended areas with the existing home.
A recessed patio floor also required concrete and screed work to establish the intended finished floor level.
The revised layout required new aluminium folding stacking doors and windows.
The exterior kitchen wall and new front face also needed painting to create a consistent appearance between the new construction and existing property.
The renovation delivered the planned structural alterations, creating a substantially reconfigured living space with new roofing, ceilings, flooring and aluminium openings.
The completed work integrated the new construction with the existing home, providing renewed interior and exterior finishes.
The new roof received 85 m² of torch on bituminous waterproofing, establishing a protective barrier against rainwater penetration.
The completed waterproofing was successful, with no roof leaks reported following installation.
The waterproofing was complemented by UV resistant silver paint across 72 m², providing additional protection against sunlight and weather exposure.
The structural renovation incorporated steel I beams, brick support columns, roof trusses and joist hangers.
These elements formed part of the new structural arrangement supporting the extended living areas and roof construction.
The renovation included 72 m² of new ceiling installation, 182 m² of floor tiling and extensive ceiling and wall painting.
The completed finishes created a consistent appearance across the renovated interior and extended areas.
The new charcoal aluminium folding stacking doors and windows updated the property's openings and complemented the revised layout.
The exterior kitchen wall and new front face were also repainted, creating a coordinated finish between the extension and existing structure.